Remote Disc Trencher
SKU M15$5,830 per unit · FOB Qingdao
40% deposit, balance before shipment. Ocean freight, insurance, duty and destination charges excluded.
Volume discount
- Order over US$30,0003% offpay 97%
- Order over US$60,0005% offpay 95%
Discount eligibility depends on the products and order value. Final pricing is confirmed in your quotation.
- Power reference
- To be confirmed
- Working width / capacity
- To be confirmed
- Weight reference
- To be confirmed
Remote Disc Trencher (SKU M15) — trenching, drilling and plowing equipment from LYVIK. Indicative unit price US$5,830, FOB Qingdao.
No online payment. Checkout creates a proforma-invoice order; we reply with bank details within one business day.
Overview
Remote Disc Trencher (SKU M15) belongs to our trenching, drilling and plowing equipment range, supplied by LYVIK. Built for compact earthmoving, loading and material handling on sites where a full-size machine will not fit.
Price is US$5,830 per unit, FOB Qingdao. Orders are confirmed by proforma invoice: 40% deposit to start production, balance before shipment. Ocean freight, insurance, import duty and destination charges are excluded. Volume discount: 3% at US$30,000 and 5% at US$60,000 of eligible order value.
Reference values: power reference: To be confirmed; working width / capacity: To be confirmed; weight reference: To be confirmed.
Reference details and specifications on this page describe the base configuration. Final mount, hydraulics, width, engine, packing and certification are confirmed on the order-specific specification sheet before the proforma invoice is issued.
Product details
Product details
- Carrier / interface
- remote crawler
- Drive / hydraulics
- disc trencher
Reference basis. Final configuration is confirmed on the order-specific specification sheet.
Product specifications
Product specifications
| Power reference | To be confirmed |
|---|---|
| Working width / capacity | To be confirmed |
| Weight reference | To be confirmed |
Reference values for the base configuration. Mount, hydraulics, width, engine and packing are confirmed before the proforma invoice is issued.
Selection guide
Choosing, specifying and ordering Remote Disc Trencher
Plan the work and the order
Describe the planned work
Use the ground-work buyer checklist to organise the common site and supplier questions.
The listing describes M15 as a remote disc trencher. The planning name and scene image are not evidence of the delivered configuration.
Identify site restrictions
Before ground disturbance, use the applicable local process to identify buried services and site restrictions. Obtain qualified advice and authorizations where required, and provide those constraints to the responsible project team.
This page cannot establish that a route is clear, approve excavation or provide a safe work method. The actual work must follow the equipment instructions and applicable local requirements.
Request the actual working assembly
Ask the supplier to identify the exact proposed working assembly, controls, mounting pieces and included equipment. If replacement or adjustment components are offered, request an itemised list, the applicable instructions and the method used to identify parts for the destination.
Request the documented working information and its conditions for the exact configuration. The word disc does not establish a particular disc, adjustment, drive system or accessory. Keep application and parts questions open until the proposal is confirmed.
Describe changes along the ground route
Divide the intended route into sections where the ground or the requested finished profile changes. Provide the supplier with the information available to the project team about surface condition, moisture, known obstructions and the intended work in each section. Identify gaps in the site information rather than assuming that an average condition represents the full route.
Ask which ground conditions and working limits are addressed in the documentation for the exact proposed assembly. The listing name does not establish suitability for a particular soil, stone content or finished profile. Where the documents do not answer the project question, keep it open for the supplier and responsible project team.
Distinguish the task behind the name
The phrase disc trencher may appear in descriptions of different kinds of ground work. For example, Bracke Forest describes disc trenchers for forestry scarification. That equipment and application are an industry example, not evidence about M15 or a substitute for identifying the buyer’s project.
State whether the project team is seeking a defined trench, surface preparation or another ground-work outcome. Request a drawing or description of the proposed result and the documented conditions for the exact offered assembly. Do not infer that different machines with similar names produce the same profile.
Compare the proposed assembly with the task
Give the supplier the desired profile and ask how the proposed configuration is intended to perform the work, including which components are supplied and how the documented operating range was defined. Request the current instructions and a clear identification of the machine and working assembly to which they apply.
If alternatives are offered, ask for an itemised description and a separate written response to the same site brief for each. Do not assume the number, size, adjustment or drive arrangement of any disc from the planning label.
Plan component support for the project
Ask how the supplier identifies replacement components for the proposed working assembly and which maintenance instructions accompany it. If the buyer wishes to price spare components, request a separate list with part identification and destination-specific availability.
Compare the offered support and warranty terms alongside the equipment quotation. Avoid assuming a service interval, component lifespan or local service provider. Confirm who receives the manuals, which language is needed and how unresolved technical questions will be handled before an order is placed.
Prepare delivery and project handover
Request the packed dimensions, transport weight and handling instructions for the exact package, including any items shipped separately. Identify the receiving location, available unloading equipment and the person responsible for checking the delivered items against the proposal.
Confirm named delivery and unloading terms, production timing and any instruction or demonstration offered for the destination.
Review controls and visibility
If remote operation is proposed, use the remote-control document checklist.
Show the intended operator position and possible obstructions on the site sketch. Do not assume an unattended mode, a particular safety outcome or a safe distance.
Check the M15 package and comparison
Request an itemised list of the proposed machine, working assembly, controls, accessories and documents. Mark each item as included, optional or pending, and ask which written limits and conditions address the actual project.
M14 is another planning reference, not a confirmed substitute or a documented comparison. Do not infer performance, safety or compatibility differences from the listing names.
Prepare the order discussion
Provide the project brief, quantity, destination and schedule. Request current documents, price, production timing, transaction method and named delivery terms for the exact proposed configuration.
Confirm destination serviceability and unloading responsibilities. The standard B2B freight, clearance and duty responsibilities are stated below; any different arrangement must be recorded in the order documents.
How to compare Disk trencher options
Disk trencher is best evaluated as a work package, not as a catalogue label. Define the material or vegetation, the working area, the access route and the result the site team expects. For Remote Disc Trencher (SKU M15), record the proposed machine, attachment interface, operating limits, transport dimensions and destination before comparing quotes. Model identity, configuration, lead time and availability are confirmed on the order-specific specification sheet. A useful Disk trencher shortlist separates the task, site access, equipment package and commercial terms so each supplier answers the same question. The sections below show what to measure and what to request in writing, without treating a category name or an illustration as proof of suitability.
Define the work
Describe the material, vegetation or surface, the area covered and how often the Disk trencher task repeats. Record the result expected after the pass.
Measure the site
Measure gates, aisles, overhead clearance, turning space, slopes and ground conditions. Add photographs and a route sketch, then have the site team confirm them.
Check the equipment package
Ask which machine, attachment and configuration are proposed. Confirm the interface, operating limits, documentation and transport dimensions for that exact package.
Compare the commercial offer
Put equipment, attachments, documentation, packing, freight, customs, price validity, lead time and support on one comparison sheet.
Site access, transport and setup
The access route is part of the Disk trencher decision. Measure the narrowest gate, aisle or doorway, the overhead clearance, the turning space and the ground surface along the route. Record slopes, soft ground, kerbs, drainage and finished surfaces. If the route crosses a public area, occupied building or restricted site, add the working hours and permissions supplied by the responsible team.
The working area also needs a simple sketch. Mark where the material or vegetation is, where it must be placed, and where the operator can stand safely. For a machine, confirm the space needed to change attachments, refuel or recharge, clean down and store the unit between shifts. A route that works for an empty machine may fail once a trailer, attachment or load is added.
Before delivery, confirm the packed dimensions and weight, the unloading method and the receiving contact. Check that the destination can accept the transport vehicle and that the site can move the unit from the unloading point to the working area. Where these details are unknown, leave them blank in the enquiry rather than guessing.
Procurement and delivery planning
For B2B orders, LYVIK’s default position is production to order, with the customer arranging freight, customs clearance and import duties unless a written agreement says otherwise. The B2C market is planned for North America.
Keep the quotation comparable. Put the machine, attachments, documentation, packing, freight, customs, price validity, lead time and after-sales support on separate lines. Ask each supplier to identify the document revision and to mark any value that is an estimate. That makes it easier to see whether two proposals describe the same scope or only the same category.
Work planning and seasonality
Map the Disk trencher work across the year rather than around a single busy week. Record peak periods, idle periods and the tasks that must be completed within a weather window. If the same unit will cover several seasons, list the attachments and changeover steps needed for each one. A proposal that looks efficient in one season may leave the crew short in another.
For each task, note the expected daily output, the number of operators and the support equipment needed. Include transport between sites, refuelling or charging, water or material supply, and cleanup. These inputs often determine whether a larger machine reduces total work or simply moves the bottleneck somewhere else.
Attachments, changeover and documentation
Ask how each attachment is mounted, what controls or hydraulic supply it needs, and how long a changeover takes with the crew available on site. Confirm that the attachment is documented for the proposed carrier. Do not assume that a shared mounting standard proves compatibility across models.
Request the operator manual, maintenance schedule, parts list and warranty statement for the exact configuration. Record who will receive the documents and who will train the operators. A complete handover package is part of the equipment offer, not an administrative extra.
How to prepare the enquiry
- Write the brief. Separate each task and site, and leave unknown values blank rather than guessing.
- Measure the route. Record the narrowest point and the space needed to work, turn and unload.
- List existing equipment. Note current machines, attachments, power sources and transport.
- Request documents. Ask for the model-specific specification, configuration list and manuals.
- Compare like with like. Use one sheet for equipment, attachments, freight and support.
- Confirm the destination. Confirm delivery point, unloading, duties, price validity and lead time.
Frequently asked questions
What should I compare when choosing Disk trencher?
Compare the work package, access, proposed machine and configuration, documentation, transport and commercial terms. A model number alone does not establish suitability.
How much does a Disk trencher cost?
This model is listed at US$5,830 per unit, FOB Qingdao. Configuration, attachments, packing, freight, destination and duties are confirmed line by line in a written quotation.
Can one machine cover several tasks?
Only if the attachment, interface and operating limits support each task. List the tasks separately and ask the supplier to confirm every combination.
What access information is needed?
Measure gates, aisles, overhead clearance, turning space, slopes and ground conditions. Confirm the route with the site team and note any restricted area.
What should the quotation include?
Ask for model and configuration, attachment list, manuals, packing, delivery point, freight basis, customs responsibility, price validity, lead time and warranty terms.
How should I compare two Disk trencher quotations?
Use the same work brief, site measurements and configuration list for both. Compare the proposed equipment package, documentation, transport, price validity, lead time, duties and support line by line. Do not compare a bare machine price with a complete delivered package.
What if the site details are incomplete?
Leave unknown values blank and state that they still need confirmation. A supplier can respond with assumptions, but those assumptions should be written down and checked before an order. Do not treat an estimated dimension or capacity as verified.



