Remote Chain Trencher

SKU M14
Indicative unit price Price list valid 30 days

$6,996 per unit · FOB Qingdao

40% deposit, balance before shipment. Ocean freight, insurance, duty and destination charges excluded.

Volume discount

  • Order over US$30,0003% offpay 97%
  • Order over US$60,0005% offpay 95%

Discount eligibility depends on the products and order value. Final pricing is confirmed in your quotation.

Power reference
To be confirmed
Working width / capacity
To be confirmed
Weight reference
To be confirmed

Remote Chain Trencher (SKU M14) — trenching, drilling and plowing equipment from LYVIK. Indicative unit price US$6,996, FOB Qingdao.

Need volume pricing or project terms? Add this item to your quote request.

No online payment. Checkout creates a proforma-invoice order; we reply with bank details within one business day.

Overview

Remote Chain Trencher (SKU M14) belongs to our trenching, drilling and plowing equipment range, supplied by LYVIK. Built for compact earthmoving, loading and material handling on sites where a full-size machine will not fit.

Price is US$6,996 per unit, FOB Qingdao. Orders are confirmed by proforma invoice: 40% deposit to start production, balance before shipment. Ocean freight, insurance, import duty and destination charges are excluded. Volume discount: 3% at US$30,000 and 5% at US$60,000 of eligible order value.

Reference values: power reference: To be confirmed; working width / capacity: To be confirmed; weight reference: To be confirmed.

Reference details and specifications on this page describe the base configuration. Final mount, hydraulics, width, engine, packing and certification are confirmed on the order-specific specification sheet before the proforma invoice is issued.

Product details

Product details

Carrier / interface
remote crawler or skid attachment
Drive / hydraulics
chain trencher

Reference basis. Final configuration is confirmed on the order-specific specification sheet.

Product specifications

Product specifications

Power referenceTo be confirmed
Working width / capacityTo be confirmed
Weight referenceTo be confirmed

Reference values for the base configuration. Mount, hydraulics, width, engine and packing are confirmed before the proforma invoice is issued.

Selection guide

Choosing, specifying and ordering Remote Chain Trencher

Plan the work and the order

Describe the planned work

Use the ground-work buyer checklist to organise the common site and supplier questions.

The listing describes M14 as a remote chain trencher. The planning name and scene image are not evidence of the delivered configuration.

Identify site restrictions

Before ground disturbance, use the applicable local process to identify buried services and site restrictions. Obtain qualified advice and authorizations where required, and provide those constraints to the responsible project team.

This page cannot establish that a route is clear, approve excavation or provide a safe work method. The actual work must follow the equipment instructions and applicable local requirements.

Request the actual working assembly

Ask the supplier to identify the exact proposed working assembly, controls, mounting pieces and included equipment. If a chain or replaceable cutting elements are proposed, ask how they are identified, what is included and which replacement parts can be quoted for the destination.

Request the current specification and operating instructions, including the configuration and conditions behind any working dimensions. The planning label does not establish a particular chain, tooth arrangement, adjustment or result. Request separate documents for each proposed alternative.

Describe the intended trench profile

Give the supplier the required trench route, the desired profile and the purpose of the work, including any changes along the route. Identify which dimensions are project requirements and which are still being determined by the responsible project team. Ask for the documented working range of the exact proposed configuration and the conditions attached to it.

Do not transfer a chain width or working depth from another machine into the M14 specification. If the requested profile falls outside the supplied documents or the project conditions are not addressed, keep the question open until the supplier and project team have reviewed it.

Map access and material management

Record gates, turns, space around the work area, overhead restrictions and locations where the project team intends to place removed material. Describe how material will be moved away and where other personnel or equipment may be present. Include space for the complete machine and any equipment that travels with it.

Ask for operating and transport dimensions and the applicable instructions for the actual proposed arrangement. The project team must determine site layout and work methods using the equipment documents and local requirements. A generic picture does not establish clearance or a material-discharge arrangement.

Plan upkeep and replacement components

Ask the supplier to identify the working components included in the proposal and the maintenance information available for the exact configuration. Where replaceable elements are proposed, request their part identification, documented maintenance guidance and a separate quotation for any desired spares.

Confirm which parts, warranty terms and support arrangements are offered for the intended destination. Do not assume a particular wear interval, component life or local service network. Maintenance requirements and support remain pending until documented for the order.

Prepare the equipment handover

Identify the person responsible for receiving the equipment and the team that will use it. Request the document language and ask whether initial instruction or a demonstration is available, what it covers and whether it is included.

Before comparing delivery offers, request the packed dimensions, weight and handling information for the proposed package. Confirm the named delivery terms and unloading arrangements for the order.

Review controls and visibility

If remote operation is proposed, use the remote-control document checklist.

Show the intended operator position and possible obstructions on the site sketch. Do not assume an unattended mode, a particular safety outcome or a safe distance.

Check the M14 package and comparison

Request an itemised list of the proposed machine, working assembly, controls, accessories and documents. Mark each item as included, optional or pending, and ask which written limits and conditions address the actual project.

M15 is another planning reference, not a confirmed substitute or a documented comparison. Do not infer performance, safety or compatibility differences from the listing names.

Prepare the order discussion

Provide the project brief, quantity, destination and schedule. Request current documents, price, production timing, transaction method and named delivery terms for the exact proposed configuration.

Confirm destination serviceability and unloading responsibilities. The standard B2B freight, clearance and duty responsibilities are stated below; any different arrangement must be recorded in the order documents.

Connect the route to the equipment proposal

Give the supplier the route sketch, desired trench profile and known ground conditions together. Ask which conditions are covered by the proposed equipment documentation and which require further information from the responsible project team.

Keep the assembly identification and document revision with each quotation. If the offer changes, request an updated response before using earlier figures for comparison.

How to compare Chain trencher options

Chain trencher is best evaluated as a work package, not as a catalogue label. Define the material or vegetation, the working area, the access route and the result the site team expects. For Remote Chain Trencher (SKU M14), record the proposed machine, attachment interface, operating limits, transport dimensions and destination before comparing quotes. Model identity, configuration, lead time and availability are confirmed on the order-specific specification sheet. A useful Chain trencher shortlist separates the task, site access, equipment package and commercial terms so each supplier answers the same question. The sections below show what to measure and what to request in writing, without treating a category name or an illustration as proof of suitability.

Define the work

Describe the material, vegetation or surface, the area covered and how often the Chain trencher task repeats. Record the result expected after the pass.

Measure the site

Measure gates, aisles, overhead clearance, turning space, slopes and ground conditions. Add photographs and a route sketch, then have the site team confirm them.

Check the equipment package

Ask which machine, attachment and configuration are proposed. Confirm the interface, operating limits, documentation and transport dimensions for that exact package.

Compare the commercial offer

Put equipment, attachments, documentation, packing, freight, customs, price validity, lead time and support on one comparison sheet.

Site access, transport and setup

The access route is part of the Chain trencher decision. Measure the narrowest gate, aisle or doorway, the overhead clearance, the turning space and the ground surface along the route. Record slopes, soft ground, kerbs, drainage and finished surfaces. If the route crosses a public area, occupied building or restricted site, add the working hours and permissions supplied by the responsible team.

The working area also needs a simple sketch. Mark where the material or vegetation is, where it must be placed, and where the operator can stand safely. For a machine, confirm the space needed to change attachments, refuel or recharge, clean down and store the unit between shifts. A route that works for an empty machine may fail once a trailer, attachment or load is added.

Before delivery, confirm the packed dimensions and weight, the unloading method and the receiving contact. Check that the destination can accept the transport vehicle and that the site can move the unit from the unloading point to the working area. Where these details are unknown, leave them blank in the enquiry rather than guessing.

Procurement and delivery planning

For B2B orders, LYVIK’s default position is production to order, with the customer arranging freight, customs clearance and import duties unless a written agreement says otherwise. The B2C market is planned for North America.

Keep the quotation comparable. Put the machine, attachments, documentation, packing, freight, customs, price validity, lead time and after-sales support on separate lines. Ask each supplier to identify the document revision and to mark any value that is an estimate. That makes it easier to see whether two proposals describe the same scope or only the same category.

Work planning and seasonality

Map the Chain trencher work across the year rather than around a single busy week. Record peak periods, idle periods and the tasks that must be completed within a weather window. If the same unit will cover several seasons, list the attachments and changeover steps needed for each one. A proposal that looks efficient in one season may leave the crew short in another.

For each task, note the expected daily output, the number of operators and the support equipment needed. Include transport between sites, refuelling or charging, water or material supply, and cleanup. These inputs often determine whether a larger machine reduces total work or simply moves the bottleneck somewhere else.

Attachments, changeover and documentation

Ask how each attachment is mounted, what controls or hydraulic supply it needs, and how long a changeover takes with the crew available on site. Confirm that the attachment is documented for the proposed carrier. Do not assume that a shared mounting standard proves compatibility across models.

Request the operator manual, maintenance schedule, parts list and warranty statement for the exact configuration. Record who will receive the documents and who will train the operators. A complete handover package is part of the equipment offer, not an administrative extra.

How to prepare the enquiry

  • Write the brief. Separate each task and site, and leave unknown values blank rather than guessing.
  • Measure the route. Record the narrowest point and the space needed to work, turn and unload.
  • List existing equipment. Note current machines, attachments, power sources and transport.
  • Request documents. Ask for the model-specific specification, configuration list and manuals.
  • Compare like with like. Use one sheet for equipment, attachments, freight and support.
  • Confirm the destination. Confirm delivery point, unloading, duties, price validity and lead time.

Frequently asked questions

What should I compare when choosing Chain trencher?

Compare the work package, access, proposed machine and configuration, documentation, transport and commercial terms. A model number alone does not establish suitability.

How much does a Chain trencher cost?

This model is listed at US$6,996 per unit, FOB Qingdao. Configuration, attachments, packing, freight, destination and duties are confirmed line by line in a written quotation.

Can one machine cover several tasks?

Only if the attachment, interface and operating limits support each task. List the tasks separately and ask the supplier to confirm every combination.

What access information is needed?

Measure gates, aisles, overhead clearance, turning space, slopes and ground conditions. Confirm the route with the site team and note any restricted area.

What should the quotation include?

Ask for model and configuration, attachment list, manuals, packing, delivery point, freight basis, customs responsibility, price validity, lead time and warranty terms.

How should I compare two Chain trencher quotations?

Use the same work brief, site measurements and configuration list for both. Compare the proposed equipment package, documentation, transport, price validity, lead time, duties and support line by line. Do not compare a bare machine price with a complete delivered package.

What if the site details are incomplete?

Leave unknown values blank and state that they still need confirmation. A supplier can respond with assumptions, but those assumptions should be written down and checked before an order. Do not treat an estimated dimension or capacity as verified.