REGISTRY / M18
Earth auger machine
Discuss the offered machine, controls, working assembly and documented site conditions.
View M18 detailsHome / Applications / Tree planting and augering
TREE PLANTING / PROJECT SOURCING
Describe the planting plan, site access and ground information, then request separate equipment proposals for the work.

These are separate enquiry lines, not a confirmed package. Ask the supplier to identify the exact equipment and any required carrier interface.
REGISTRY / M18
Discuss the offered machine, controls, working assembly and documented site conditions.
View M18 details
ATTACHMENT / AT02
Discuss the proposed drive, bit, mounting and carrier requirements separately.
View AT02 details
MACHINE / N38
Discuss a carrier or separate excavation requirement; attachment fit is not established.
View N38 detailsOPTIONAL PROJECT DETAILS
Add site and purchasing information to the local enquiry. Unknown details can remain blank and notes can be edited later.
Consider these additional options for the work your project requires. Select only the machines you need; compatibility and suitability require confirmation.
Planning references: exact models, specifications, prices, availability and suitability are confirmed in the written quotation.
Prepare one project enquiry →Local preview only: enquiries are saved on this computer and are not sent to a sales team.
Identify each property and the intended planting areas. Where a plan is available, label the proposed positions and the information the project team has verified. Record the number of positions as a buyer requirement and identify which parts of the plan may change. A planning diagram is not evidence of ground suitability or a safe work method.
Explain whether the enquiry covers only hole preparation or also includes separate site preparation, material movement or planting-related equipment. Give each supplier the same task description and identify what the buyer expects to arrange independently. Request a separate quotation line for any machine or attachment being considered.
Provide the planned hole dimensions and spacing only if the responsible project team has established them. Identify the source and whether each value is measured or provisional. Ask suppliers which documented working assemblies they can offer for those requirements. The dimensions in a buyer brief are not a confirmed capability of M18 or AT02.
An enquiry may need a complete machine, a carrier-mounted attachment or a replacement bit. Ask the supplier to identify the drive, bit, mounting components and any other included items for the exact offer. The bit photograph on this page does not establish that a drive or an attachment interface is supplied.

The supplier must identify the proposed assembly and its documented conditions.
A contractor preparing several planting sites can list the tree stock, intended positions and access information separately for each property. M18 is the registry option for this application; AT02 can be discussed separately if the buyer wants an attachment proposal for a documented carrier. Ask which bit and drive are offered for the actual requirements and which information remains unresolved. These are alternatives to evaluate, not a confirmed kit.
If the buyer is also sourcing a machine, list N38 and AT02 as separate models with quantities and intended tasks. Provide the planting plan and site information, then ask for the exact offered carrier, mounting parts and attachment requirements. The supplier must confirm the complete combination in writing. N38 may instead be discussed for a separate excavation task; its presence here does not establish that it drives AT02.
Before any ground work, the responsible team must identify underground services and other restrictions through the applicable local process, and obtain qualified assistance where needed. Record overhead obstructions and nearby structures in the site brief. This page cannot verify a site, provide clearance or authorise drilling.
Provide the ground and surface information known to the site team and identify where conditions differ across the property. If information is incomplete, keep it open for the responsible team and supplier. Do not infer soil suitability, drilling performance or an operating limit from a machine name or an illustrative bit.
Show the route from unloading to each planting area, including gates, turns, overhead limitations and storage space. Request documented transport and operating dimensions for the complete proposed equipment and identify the measurement points. The responsible team must compare the actual route and configuration using the applicable instructions.
If the buyer serves several properties, keep site information and quantities separate. Note where ground, access or scheduling differs, and ask whether a supplier proposes different equipment or a different configuration for any site. A response for one location should not be treated as approval for another without review.

Provide the carrier identity and ask for written interface confirmation.
For M18, request the supplier’s exact machine identity, controls, working assembly, current documentation and included parts. The registry’s remote tracked description is a planning label; drive, control method, performance and availability are not confirmed. Ask which documented conditions apply to the buyer’s site and proposed work.
For AT02, identify the proposed drive and bit separately and request their model identifiers and applicable documentation. Ask which sizes or alternatives the supplier actually offers and whether mounting pieces, hoses or adapters are included. Do not infer a bit diameter, depth or power requirement from another seller’s product.
If the proposal uses a separate carrier, supply the manufacturer, exact model and documented interface information. Request written confirmation for the complete carrier and attachment combination, including mounting and any power or control requirements. N38 and AT02 are separate models; their appearance together does not establish compatibility.
Ask for dimensions, weight, included equipment and instructions for each exact proposal. Clarify which parts are installed, supplied loose or optional and which conditions apply to any stated capability. Keep alternatives and their document revisions separate so a figure for one bit or machine is not attributed to another.
List the number of machines, attachments and any requested bits separately. If the buyer wants an evaluation unit or staged deliveries, describe those as separate requirements and ask for separate terms. Availability, production timing and any minimum quantity depend on the supplier’s actual offer.
Request a way to identify replacement bits and other components for the exact offered configuration, plus the relevant operating and maintenance information. Ask whether requested documentation, parts, training or service can be provided at the destination. These items, their language, price and coverage are confirmed in the written quotation.
Provide the destination, receiving location and any unloading constraints. Request packing dimensions, gross weight and handling information when available. Unless otherwise agreed, the B2B buyer pays freight, arranges import clearance and pays duties. Confirm named trade terms, serviceability and any additional services in the written quotation.
Send suppliers the same site brief, quantities and destination. Keep each dated offer with the exact product identity, included parts, drawings, price, production timing and transaction method. Mark unanswered safety, interface or support questions visibly. Submitting the local preview does not reserve equipment or establish that the site is ready for ground work.
RELATED INDUSTRIES
Plan equipment for tree planting and augering is best evaluated as a work package, not as a catalogue label. Define the material or vegetation, the working area, the access route and the result the site team expects. For Plan equipment for tree planting and augering (SKU ), record the proposed machine, attachment interface, operating limits, transport dimensions and destination before comparing quotes. Model identity, configuration, price, lead time and availability are confirmed in the written quotation. A useful Plan equipment for tree planting and augering shortlist separates the task, site access, equipment package and commercial terms so each supplier answers the same question. The sections below show what to measure and what to request in writing, without treating a category name or an illustration as proof of suitability.
Describe the material, vegetation or surface, the area covered and how often the Plan equipment for tree planting and augering task repeats. Record the result expected after the pass.
Measure gates, aisles, overhead clearance, turning space, slopes and ground conditions. Add photographs and a route sketch, then have the site team confirm them.
Ask which machine, attachment and configuration are proposed. Confirm the interface, operating limits, documentation and transport dimensions for that exact package.
Put equipment, attachments, documentation, packing, freight, customs, price validity, lead time and support on one comparison sheet.
| Decision | What to record |
|---|---|
| Work package | Material or vegetation, area, frequency and required finish for Plan equipment for tree planting and augering |
| Access | Gate or aisle width, overhead clearance, turning space, slope and ground condition |
| Equipment | Proposed machine, attachment interface, configuration and documented limits |
| Delivery | Packed dimensions, weight, destination, unloading and customs responsibility |
The access route is part of the Plan equipment for tree planting and augering decision. Measure the narrowest gate, aisle or doorway, the overhead clearance, the turning space and the ground surface along the route. Record slopes, soft ground, kerbs, drainage and finished surfaces. If the route crosses a public area, occupied building or restricted site, add the working hours and permissions supplied by the responsible team.
The working area also needs a simple sketch. Mark where the material or vegetation is, where it must be placed, and where the operator can stand safely. For a machine, confirm the space needed to change attachments, refuel or recharge, clean down and store the unit between shifts. A route that works for an empty machine may fail once a trailer, attachment or load is added.
Before delivery, confirm the packed dimensions and weight, the unloading method and the receiving contact. Check that the destination can accept the transport vehicle and that the site can move the unit from the unloading point to the working area. Where these details are unknown, leave them blank in the enquiry rather than guessing.
For B2B orders, LYVIK’s default position is production to order, with the customer arranging freight, customs clearance and import duties unless a written agreement says otherwise. The B2C market is planned for North America. Destination serviceability, transaction method, price and lead time are confirmed in the written quotation for each Plan equipment for tree planting and augering proposal.
Keep the quotation comparable. Put the machine, attachments, documentation, packing, freight, customs, price validity, lead time and after-sales support on separate lines. Ask each supplier to identify the document revision and to mark any value that is an estimate. That makes it easier to see whether two proposals describe the same scope or only the same category.
Map the Plan equipment for tree planting and augering work across the year rather than around a single busy week. Record peak periods, idle periods and the tasks that must be completed within a weather window. If the same unit will cover several seasons, list the attachments and changeover steps needed for each one. A proposal that looks efficient in one season may leave the crew short in another.
For each task, note the expected daily output, the number of operators and the support equipment needed. Include transport between sites, refuelling or charging, water or material supply, and cleanup. These inputs often determine whether a larger machine reduces total work or simply moves the bottleneck somewhere else.
Ask how each attachment is mounted, what controls or hydraulic supply it needs, and how long a changeover takes with the crew available on site. Confirm that the attachment is documented for the proposed carrier. Do not assume that a shared mounting standard proves compatibility across models.
Request the operator manual, maintenance schedule, parts list and warranty statement for the exact configuration. Record who will receive the documents and who will train the operators. A complete handover package is part of the equipment offer, not an administrative extra.
Compare the work package, access, proposed machine and configuration, documentation, transport and commercial terms. A model number alone does not establish suitability.
Price is confirmed in the written quotation and depends on configuration, attachments, packing, freight, destination and duties. Request a written quotation with each line separated.
Only if the attachment, interface and operating limits support each task. List the tasks separately and ask the supplier to confirm every combination.
Measure gates, aisles, overhead clearance, turning space, slopes and ground conditions. Confirm the route with the site team and note any restricted area.
Ask for model and configuration, attachment list, manuals, packing, delivery point, freight basis, customs responsibility, price validity, lead time and warranty terms.
Use the same work brief, site measurements and configuration list for both. Compare the proposed equipment package, documentation, transport, price validity, lead time, duties and support line by line. Do not compare a bare machine price with a complete delivered package.
Leave unknown values blank and state that they still need confirmation. A supplier can respond with assumptions, but those assumptions should be written down and checked before an order. Do not treat an estimated dimension or capacity as verified.