2.5 Ton Mini Excavator

SKU N40
Indicative unit price Price list valid 30 days

$12,402 per unit · FOB Qingdao

40% deposit, balance before shipment. Ocean freight, insurance, duty and destination charges excluded.

Volume discount

  • Order over US$30,0003% offpay 97%
  • Order over US$60,0005% offpay 95%

Discount eligibility depends on the products and order value. Final pricing is confirmed in your quotation.

Power reference
22.1kW
Working width / capacity
2.5t, 0.1m3
Dimensions (reference)
4800x1300x2280mm
Weight reference
2200kg

2.5 Ton Mini Excavator (SKU N40) — mini excavators from LYVIK. Indicative unit price US$12,402, FOB Qingdao.

Need volume pricing or project terms? Add this item to your quote request.

No online payment. Checkout creates a proforma-invoice order; we reply with bank details within one business day.

Overview

2.5 Ton Mini Excavator (SKU N40) belongs to our mini excavators range, supplied by LYVIK. Built for compact earthmoving, loading and material handling on sites where a full-size machine will not fit.

Price is US$12,402 per unit, FOB Qingdao. Orders are confirmed by proforma invoice: 40% deposit to start production, balance before shipment. Ocean freight, insurance, import duty and destination charges are excluded. Volume discount: 3% at US$30,000 and 5% at US$60,000 of eligible order value.

Reference values: power reference: 22.1kW; working width / capacity: 2.5t, 0.1m3; dimensions (reference): 4800x1300x2280mm; weight reference: 2200kg.

Reference details and specifications on this page describe the base configuration. Final mount, hydraulics, width, engine, packing and certification are confirmed on the order-specific specification sheet before the proforma invoice is issued.

Product details

Product details

Carrier / interface
crawler
Drive / hydraulics
Laidong 3TE30, 22.1kW; backhoe
Packing reference
nude in container; 4 units/20GP

Reference basis. Final configuration is confirmed on the order-specific specification sheet.

Product specifications

Product specifications

Power reference22.1kW
Working width / capacity2.5t, 0.1m3
Dimensions (reference)4800x1300x2280mm
Weight reference2200kg
Warranty reference1 year

Reference values for the base configuration. Mount, hydraulics, width, engine and packing are confirmed before the proforma invoice is issued.

Selection guide

Choosing, specifying and ordering 2.5 Ton Mini Excavator

Plan the work and the order

Define the work and access

Measure the narrowest gates and overhead restrictions, and record where excavated material will be placed.

The listing includes a 2.5-ton class label.

Request the exact working diagram

Ask for the working-range diagram and written limits for the proposed boom, arm and bucket. Clarify the configuration, reference points and conditions behind each value, then compare those definitions with the project’s reach and depth requirements.

For alternative working equipment, request the applicable information for each option rather than transferring a value from another machine. The responsible site team must identify buried services and applicable permissions before excavation; the listing does not establish site safety.

Check attachments and logistics

List the buckets or other attachments required and ask for written compatibility, mounting dimensions and relevant controls or hydraulic requirements. Confirm which parts and documents are included.

Request the complete transport weight and dimensions, loading instructions, maintenance information and destination support terms.

Describe the full working space

Show the planned machine position, nearby structures, access route and material placement area on the project sketch. Record known restrictions separately for each location where the equipment is expected to work.

Ask which overall dimensions, movement envelope and conditions the supplier documents for the exact proposed configuration. A listing name does not establish a particular tail-swing design or clearance.

Build a budget beyond the machine price

A fleet buyer can compare each proposal using the same ownership period and estimated annual use as planning inputs. List the machine and working equipment separately from transport, unloading, insurance, duties and the expected operating supplies. Enter the buyer’s own assumptions as estimates; leave any amount that has not been quoted blank rather than treating it as included.

Ask for the maintenance instructions and an itemised quote for any suggested wear parts or initial spares, including the destination and lead time. Record whether a response is a firm offer or an estimate and what it excludes. This comparison helps expose unanswered costs; it is not a prediction of operating cost or uptime.

Clarify attachment power and controls

Give each proposed tool a separate row: its intended task, whether it is already owned, its manufacturer and model, and the mounting, control and power information available from its documentation. Send the same list to each supplier when comparing the proposed machine.

Ask the supplier to identify the mounting parts, controls and any auxiliary connections for every exact machine-and-tool pair. Request written compatibility with the supporting document revision, and mark components as included, separately priced or buyer-provided. The N40 listing does not establish that any particular circuit, coupler or adapter is supplied.

Prepare the B2B enquiry

Provide site measurements, intended work, quantity, destination and schedule. Request an itemised configuration, current documents, price, production timing and transaction method.

Confirm the named delivery terms and unloading arrangements.

How to compare 2.5 ton mini excavator options

2.5 ton mini excavator is best evaluated as a work package, not as a catalogue label. Define the material or vegetation, the working area, the access route and the result the site team expects. For 2.5 Ton Mini Excavator (SKU N40), record the proposed machine, attachment interface, operating limits, transport dimensions and destination before comparing quotes. Model identity, configuration, lead time and availability are confirmed on the order-specific specification sheet. A useful 2.5 ton mini excavator shortlist separates the task, site access, equipment package and commercial terms so each supplier answers the same question. The sections below show what to measure and what to request in writing, without treating a category name or an illustration as proof of suitability.

Define the work

Describe the material, vegetation or surface, the area covered and how often the 2.5 ton mini excavator task repeats. Record the result expected after the pass.

Measure the site

Measure gates, aisles, overhead clearance, turning space, slopes and ground conditions. Add photographs and a route sketch, then have the site team confirm them.

Check the equipment package

Ask which machine, attachment and configuration are proposed. Confirm the interface, operating limits, documentation and transport dimensions for that exact package.

Compare the commercial offer

Put equipment, attachments, documentation, packing, freight, customs, price validity, lead time and support on one comparison sheet.

Site access, transport and setup

The access route is part of the 2.5 ton mini excavator decision. Measure the narrowest gate, aisle or doorway, the overhead clearance, the turning space and the ground surface along the route. Record slopes, soft ground, kerbs, drainage and finished surfaces. If the route crosses a public area, occupied building or restricted site, add the working hours and permissions supplied by the responsible team.

The working area also needs a simple sketch. Mark where the material or vegetation is, where it must be placed, and where the operator can stand safely. For a machine, confirm the space needed to change attachments, refuel or recharge, clean down and store the unit between shifts. A route that works for an empty machine may fail once a trailer, attachment or load is added.

Before delivery, confirm the packed dimensions and weight, the unloading method and the receiving contact. Check that the destination can accept the transport vehicle and that the site can move the unit from the unloading point to the working area. Where these details are unknown, leave them blank in the enquiry rather than guessing.

Procurement and delivery planning

For B2B orders, LYVIK’s default position is production to order, with the customer arranging freight, customs clearance and import duties unless a written agreement says otherwise. The B2C market is planned for North America.

Keep the quotation comparable. Put the machine, attachments, documentation, packing, freight, customs, price validity, lead time and after-sales support on separate lines. Ask each supplier to identify the document revision and to mark any value that is an estimate. That makes it easier to see whether two proposals describe the same scope or only the same category.

Work planning and seasonality

Map the 2.5 ton mini excavator work across the year rather than around a single busy week. Record peak periods, idle periods and the tasks that must be completed within a weather window. If the same unit will cover several seasons, list the attachments and changeover steps needed for each one. A proposal that looks efficient in one season may leave the crew short in another.

For each task, note the expected daily output, the number of operators and the support equipment needed. Include transport between sites, refuelling or charging, water or material supply, and cleanup. These inputs often determine whether a larger machine reduces total work or simply moves the bottleneck somewhere else.

Attachments, changeover and documentation

Ask how each attachment is mounted, what controls or hydraulic supply it needs, and how long a changeover takes with the crew available on site. Confirm that the attachment is documented for the proposed carrier. Do not assume that a shared mounting standard proves compatibility across models.

Request the operator manual, maintenance schedule, parts list and warranty statement for the exact configuration. Record who will receive the documents and who will train the operators. A complete handover package is part of the equipment offer, not an administrative extra.

How to prepare the enquiry

  • Write the brief. Separate each task and site, and leave unknown values blank rather than guessing.
  • Measure the route. Record the narrowest point and the space needed to work, turn and unload.
  • List existing equipment. Note current machines, attachments, power sources and transport.
  • Request documents. Ask for the model-specific specification, configuration list and manuals.
  • Compare like with like. Use one sheet for equipment, attachments, freight and support.
  • Confirm the destination. Confirm delivery point, unloading, duties, price validity and lead time.

Frequently asked questions

What should I compare when choosing 2.5 ton mini excavator?

Compare the work package, access, proposed machine and configuration, documentation, transport and commercial terms. A model number alone does not establish suitability.

How much does a 2.5 ton mini excavator cost?

This model is listed at US$12,402 per unit, FOB Qingdao. Configuration, attachments, packing, freight, destination and duties are confirmed line by line in a written quotation.

Can one machine cover several tasks?

Only if the attachment, interface and operating limits support each task. List the tasks separately and ask the supplier to confirm every combination.

What access information is needed?

Measure gates, aisles, overhead clearance, turning space, slopes and ground conditions. Confirm the route with the site team and note any restricted area.

What should the quotation include?

Ask for model and configuration, attachment list, manuals, packing, delivery point, freight basis, customs responsibility, price validity, lead time and warranty terms.

How should I compare two 2.5 ton mini excavator quotations?

Use the same work brief, site measurements and configuration list for both. Compare the proposed equipment package, documentation, transport, price validity, lead time, duties and support line by line. Do not compare a bare machine price with a complete delivered package.

What if the site details are incomplete?

Leave unknown values blank and state that they still need confirmation. A supplier can respond with assumptions, but those assumptions should be written down and checked before an order. Do not treat an estimated dimension or capacity as verified.